Showing posts with label CS605. Show all posts
Showing posts with label CS605. Show all posts

CS605 GDB Solution Spring 2019


Hello VU students here is the solution of CS605-Software Engineering GDB No.1 Spring 2019. GDB total marks 5. GDB Solution file. You also like our Facebook Page, Join Facebook Group, follow on Google+ and Subscribe our YouTube Channel. Please Share it with your Friends. Thank you.
Solution for the GDB is presented for your convenience. Download it and make it according to your requirement and do not copy paste.
GDB Idea Solution:
Restructuring the whole software will improve the performance, speed and will increase the user number that can use the software as refactoring the code is basically used to modify existing computer code without changing its external behavior that cannot improve a software. The advantages of refactoring is to improve code readability and reduced complexity that can improve source code maintainability but cannot improve that performance. But on the other side, code restructuring is a form of perfectible maintenance that modifies the structure of a program's source code that helps make software speedy and make its performance better. Its goal to be increase maintainability for better facilitate other maintenance activities, such as adding new functionality.



CS605 Assignment 2 Solution fall 2017

CS605 ASSIGNMENT 2 SOLUTION FALL 2017

Dear VU (Virtual University of Pakistan) Students, here you read and download CS605 (Software Engineering II) Assignment No.2 SolutionFall–2017. Assignment Total Marks 10. You can download easily Assignment Solution click the download button and get Assignment Solution. Assignment Open Date 2nd January 2018 and Assignment Closing Date 8th January 2018. You can also like for latest update our Facebook page, YouTube channel and follow on Google+. (VU Ki Duniya) previously shared CS605 (Software Engineering II)Assignment No.1 Solution Fall–2017.


ASSIGNMENT important instructions

Please read the following instructions carefully before submitting assignment:
You need to use MS word document to prepare and submit the assignment on VU-LMS.
It should be clear that your assignment will not get any credit if:
  • The assignment is submitted after due date.
  • The assignment is not in the required format (.doc or docx)
  • The submitted assignment does not open or file is corrupt.
  • Assignment is copied(partial or full) from any source (websites, forums, students, etc)

ASSIGNMENT objective

The objective of this assignment is to learn:
  • Defect removal efficiency
  • Metrics for specification quality

ASSIGNMENT question no.1

Mira Soft is a software house which has completed a project of Human Resource Management (HRM) system for one of its client. During the development of this software, 65 errors were found before delivery of this software. After completion, this HRM system was delivered to the client. Within only 8 months of operations after delivery, the client reported 25 errors in this system. You are required to find the Defect Removal Efficiency for this project. And fill in the following table:

ASSIGNMENT question no.2

First-Tech software house is currently working on a project of developing Transaction Management System. For this project functional requirements are 16, and non-functional requirements are 4. Number of requirements for which all reviewers had identical interpretation are 10.


Keeping metrics for specification quality in mind you are required to calculate lack of ambiguity in the requirements for this project and provide your answer in given table:

download cs605 assignment solution 

Download CS605Assignment Solution by Clicking the Download Button Below in just single Click.

Download

You can Also Download Midterm Solved Past Papers, Final term Solved Past Papers, GDB Solutions, Assignment Solutions, and Solved Quizzes files, PPT Slides, Handouts and Short Notes.

CS605 Assignment No 1 Solution Fall 2017

CS605 Assignment No 1 Solution Fall 2017:

Here You Can Read and Download ENG201 Assignment Solutions. You Can Also Download Solved Mid Term Papers, Short Notes, Assignment Solutions, Lecture Wise Questions Answers Files, Solved MCQs, Solved Quiz, Solved Mid Term Subjective Papers, Solved Mid Term Objective Papers, Solved Final Term Objective Papers, Solved Final Term Subjective Papers from VU Ki Duniya for Preparation of Mid Term Papers



CS605 Complete Assignment No 1 Solution Fall 2017:


Assignment No. 01
Semester: Fall 2017
CS605: Software Engineering II
Total Marks: 15
Due Date: 6th-Nov 2017

Instructions:

Please read the following instructions carefully before submitting assignment:
You need to use MS word document to prepare and submit the assignment on VU-LMS.
It should be clear that your assignment will not get any credit if:

The assignment is submitted after due date.
The assignment is not in the required format (.doc or docx)
The submitted assignment does not open or file is corrupt.
Assignment is copied (partial or full) from any source (websites, forums, students, etc.)

Learning Outcome:

After completing this assignment, the student will be able to:
Identify Capability Maturity Model (CMM) level as per scenario.
Select appropriate Software Development Life Cycle (SDLC) model as per given requirements.


Note:
This assignment is a Graded Assignment.

Assignment:

Question No.1:                                                
Suppose you are working in a software development company as a project manager.  This company is currently working on a project of developing software system for space crafts. The project is associated with very high risk element.  As a project manager which Software Development Life Cycle model you will choose for above scenario to complete the task.

Name the lifecycle model with proper reason.

Question No.1:                                                
For a software development project, the project manager has chosen a Software Lifecycle model in which the product is constructed without specification or any effort at design. The developers just build a product that is revised as many times as necessary to satisfy the client.

For the above scenario answer the following questions:

Name the Software Life Cycle Model that is chosen in above scenario?
For which type of projects the above life cycle model may work?
          
Question No.3:                                               

Alibaba is well established software house which is performing its operations very efficiently.
For continuous process improvement, Alibaba takes qualitative feedback from the processes and tests innovative ideas and technologies on regular basis.

Identify the CMM level for Alibaba and write any two KPAs of this level.

You May Also Like:



Download Complete Solution:

Download CS605 Assignment Solution by Clicking the Download Button Below in just single Click.
Assignment